Loading...
Location
London, Ontario
Website
https://www.sarnia.ca/oversized-load-corridor/
Start Date
19-11-2020 3:00 PM
End Date
19-11-2020 3:00 PM
Description
The Oversized Load Corridor (OLC) is a designated protected route on existing roadways connecting fabricators to the Port of Sarnia for the unimpeded import/export and trans-shipment of oversized products to and from fabricators’ locations and Sarnia-Lambton’s industrial base. Bluewater Power's job is to clear a path that can accommodate a vessel that is 9m wide, 9m high and 45 m long over 26kms of roadway. My job is to capture the changes our engineers have made to accommodate this size in GIS. Using ArcFM & the OLC project, this lightning talk will show you what a typical electrical GIS system looks like and how it is utilized. For more information on the OLC project please visit: www.sarnia.ca/oversized-load-corridor.
SRT File for Aiden Poole's lightning talk.
Utility GIS in action: Sarnia oversized load corridor, Lightning Talk (7 min)
London, Ontario
The Oversized Load Corridor (OLC) is a designated protected route on existing roadways connecting fabricators to the Port of Sarnia for the unimpeded import/export and trans-shipment of oversized products to and from fabricators’ locations and Sarnia-Lambton’s industrial base. Bluewater Power's job is to clear a path that can accommodate a vessel that is 9m wide, 9m high and 45 m long over 26kms of roadway. My job is to capture the changes our engineers have made to accommodate this size in GIS. Using ArcFM & the OLC project, this lightning talk will show you what a typical electrical GIS system looks like and how it is utilized. For more information on the OLC project please visit: www.sarnia.ca/oversized-load-corridor.
https://ir.lib.uwo.ca/wlgisday/2020/lighteningtalks/6